Contact Info
What is an ERP requirements specification for a Qatar business?
It is the numbered document a Qatar company uses to tender, contract and accept an ERP. It sets out functional requirements by process area, statutory lines such as corporate income tax and withholding data, WPS salary files and Arabic printouts, tax-readiness lines in case VAT arrives, plus hosting, access, audit, site connectivity, integration and migration needs. I write it remotely, with business-set priorities and links to demos and tests.
Last reviewed by Vikas Saroj
Without a VAT return forcing the issue, Qatar ERP projects can drift into selection with requirements that exist only as a few slides and a partner's discovery notes. The gaps show up later: a WPS file nobody specified, a QFC entity configured like the rest of the group, a project site that cannot post a goods receipt.
I write ERP requirements specifications for Qatar companies as an independent consultant working remotely. The output is a single controlled document: what each process area needs, the statutory and tax-readiness lines your advisor confirms, how the system must behave, and what it must connect to, all phrased so a vendor can answer and a tester can verify.
That document becomes the requirement annex of your tender, the baseline in the implementation contract and the checklist for acceptance testing.
Each part is reviewed by the person who owns that area of the business before the baseline is issued.
Lines for estimating, contracts, billing, purchasing, stores, plant, projects, HR and finance, each written once, attached to a process step and given an owner who will sign it off.
Corporate income tax and withholding data, WPS output and record keeping as present-day must-haves, plus tax-readiness lines that let the system take on VAT later without a redesign.
How mainland companies, QFC entities and free zone units are kept apart in the ledger, how they trade with each other, and which reports each one needs.
Hosting and data location questions, access by role and entity, change history on sensitive fields, expected volumes and what project sites need when connectivity is weak.
Bank files, WPS submission routes, HR and timesheet tools, fleet or plant systems, plus the open contracts, retentions, balances and history that must move across intact.
A bidder version with response columns, a frozen copy for the implementation contract and a change log that keeps both honest after signature.
Bring every source into one place
One testable statement per line
Issue and protect the baseline
The document is organized so the head of each function can open their own part, read it in one sitting and sign it. For a Qatar company I use these parts:
Every requirement is a single sentence with a reference code, an owner, a priority and a test condition. The test condition matters most. "Track project costs" is a topic; "every purchase order must carry a project and cost code, and the project cost report must show committed and actual cost separately" is a requirement a vendor can demonstrate and your team can accept or reject.
The interviews and process maps that feed this document are described on my Qatar ERP business analyst page. This page is about the specification itself and what it is used for once written.
Qatar has not introduced VAT so far, so the statutory chapter looks different from that of its neighbors. It is still essential, and I draft it with finance and your tax advisor, who confirms each line before it is signed. I do not advise on tax; I turn the advisor's guidance into requirements.
Lines that commonly apply today include:
Then come tax-readiness lines, marked as should-have rather than must-have: tax codes held on items, customers and suppliers even if unused; invoice layouts with space for a tax registration number and tax breakdown; reports able to separate taxable categories. If VAT or e-invoicing is introduced, these lines let the system adapt through configuration rather than a rebuild. The Qatar ERP consultant page covers the wider tax picture.
Behavior requirements, often called non-functional requirements, describe how the ERP must perform rather than what it does. They are short to write and easy to forget, and in Qatar a few of them carry real weight.
A behavior that is missing from the specification is just as easily missing from the contract.
Each interface is written as its own requirement group: which systems, which data, which direction, how often, which side holds the master record and how failures are raised. For Qatar companies the list often includes bank payment and statement files, the WPS route through the bank, HR or timesheet tools used on sites, plant or fleet systems, and sometimes a client or main contractor portal for payment applications.
Data migration requirements are just as specific. They state which master records move, how open contracts are brought across with their billed-to-date values, retentions held and advances outstanding, which open invoices and orders transfer, how stock and plant registers are loaded, and how opening balances are reconciled for each entity. Anything not migrated has an archive requirement so it remains retrievable. My ERP data migration page explains how this is executed later.
Priorities are set by the business in plain bands, running from essential at go-live down to deferred to a later phase. The tax-readiness lines described above fit naturally in the should-have band. Each must-have line is traced forward to a scripted demo scenario and then to a UAT case, and the trace lives in a matrix next to the fit result from the ERP gap analysis. If a vendor later claims a line was never agreed, the matrix shows where it was demonstrated and tested.
Once signed, the specification is issued as the requirement annex in your request for proposal. Bidders answer each line as standard, configuration, add-on, custom or not offered, with comments. Because every bidder answers the same lines, their offers become comparable, which is the core of the work on my Qatar ERP selection page. The signed baseline is then attached to the implementation contract so scope means the same thing to both sides.
Control is kept simple. Each issue carries a version label, chapter owners sign their own parts, finance signs the statutory chapter once the advisor's confirmation is on file, and any later change goes through a recorded request with its reason and effect on cost.
Gaps that put Qatar specifications at risk:
If you want help running the tender that uses this document, ERP RFP consulting covers it; otherwise begin at the Qatar overview.
Tell me about your business and current systems. I’ll suggest the most sensible first step.
Book a Consultation
Not sure which ERP you need?
Share your business requirements with me and I will help you understand the right process, architecture and platform before implementation.
Because other obligations already need data, such as corporate income tax workings for foreign-owned shares, withholding on certain payments and record keeping, all confirmed by your advisor. Tax-readiness lines also make sure the system could take on VAT or e-invoicing through configuration if Qatar introduces them, rather than needing a redesign.
Often they need some. The specification flags the lines specific to a QFC or free zone company, covering separate ledgers, number series, access, intercompany trading and reporting. Your advisor confirms any tax or regulatory differences; the document makes sure the system can support them.
Yes. Discovery notes from a partner are a useful source but tend to describe their product. I rebuild them into numbered, testable lines by process area, add statutory, behavior, interface and migration requirements that are missing, and reset priorities with your process owners so the document works for any bidder.
Interviews and review sessions run on video calls during Qatar working hours, and the draft sits in a shared workspace where owners comment line by line. The engagement runs in English. Any on-site session would be by arrangement. I take no commissions from vendors or partners, so the wording favors no product.
Every business is different. Share where you are today and what you want to fix, and I’ll tell you honestly whether and how I can help.
Book a Consultation
Book a consultation to talk through your processes, systems and goals. I’ll reply with practical next steps - no obligation.