Contact Info
What does an ERP BRD consultant do?
An ERP BRD consultant prepares the business requirement document that defines what an ERP project must deliver. As an independent ERP BRD consultant, I structure the document section by section: objectives, scope, current and future processes, prioritized requirements, data, integrations, reporting and acceptance criteria. I then guide the review and sign-off, so vendors and implementers can quote, design and test against one agreed reference.
Last reviewed by Vikas Saroj
A business requirement document is the contract between your business and everyone who will build or sell you an ERP. As an ERP BRD consultant, I write that document so it is complete enough to quote against, clear enough for business owners to sign, and specific enough to test against at the end.
I have seen BRDs that run to hundreds of pages and still leave the important questions unanswered, and others that are a single spreadsheet of features with no context. A useful BRD sits between those extremes: structured, prioritized, traceable and readable by a busy finance director.
I write the BRD from your processes and requirements, not from a vendor template. It stays your document, usable with any platform and any implementation partner you choose.
Whether you are starting from nothing or rescuing a draft that has stalled, these are the services I offer around the BRD.
I write the full business requirement document from workshops, interviews and existing material, in a consistent structure your stakeholders, vendors and implementers can all navigate without a guide.
An independent review of an existing BRD for missing sections, vague requirements, inflated priorities and vendor bias, followed by a corrected version ready for sign-off.
Clear in-scope and out-of-scope statements by entity, department, process and phase, plus documented assumptions and constraints, so cost and timeline discussions start from the same baseline.
For each key requirement, a short description of how the business will confirm it works. These criteria later become the starting point for UAT scripts and formal acceptance.
Structured review sessions with each process owner, a comment log, and a final walkthrough with the sponsor, so sign-off reflects real agreement rather than a rushed signature.
A version of the BRD prepared for external use, with the context vendors need to respond properly and the questions they must answer, ready to attach to an RFP or demo invitation.
Business first, technology second. You can hire me for one step - a BRD, a gap analysis, a vendor shortlist - or for the whole journey.
Agree the outline and inputs
Write a complete, readable document
Review with owners and sign off
The exact structure depends on the size of the project, but a solid ERP BRD usually contains the following sections, in roughly this order:
My article on how to create an ERP BRD walks through these sections in more depth if you want to try drafting one yourself.
The requirements chapters are the heart of the BRD, and the place where weak documents fall apart. A requirement such as "the system should support inventory" will be answered with a confident yes by every vendor. It tells you nothing.
I write each requirement with a standard set of fields:
For example, rather than "multi-currency support", the BRD says that the business invoices customers in several currencies, needs exchange differences posted automatically at payment, and needs management reports in a single reporting currency. That level of detail lets vendors give honest answers and lets you compare them.
The requirement content itself comes from proper elicitation, which is covered by my ERP requirements gathering service. The BRD packages that material with the context, scope and controls needed to make it a decision document.
A BRD without proper sign-off is just a draft that everyone remembers differently. I treat the review as a structured part of the work, not a formality at the end.
Typical roles in sign-off are:
I run short review sessions per section, keep a comment log, and record how each comment was resolved. Disagreements between departments are surfaced and settled during review rather than discovered during implementation. Once signed, the BRD becomes a baseline under change control: later changes are allowed, but they are logged, assessed and approved, not slipped in quietly.
This discipline is what turns the BRD into a reliable reference for gap analysis, design and UAT.
A good BRD does different jobs at different stages of the project.
During selection, vendors use it to decide whether to bid, which product and edition to propose, and how to estimate effort. A clear BRD reduces the guesswork in their proposals, so the numbers you receive are more comparable. It also lets you invite scripted demos that follow your processes rather than the vendor's favorite screens. If you are running a formal tender, the BRD becomes the core of the ERP RFP.
During design, the implementer uses it to run fit-gap analysis and produce a solution design document. Every design decision should trace back to a BRD requirement.
During testing, the acceptance criteria in the BRD become the basis for UAT scripts. The business tests against what it signed, not against what the implementer chose to build.
During disputes, which do happen, the signed BRD is the reference point for what was agreed. That alone often prevents a disagreement about scope from becoming a commercial conflict.
Many vendors offer to write the BRD for free as part of their sales process. It is a tempting offer, but it carries an obvious risk: a BRD written by a vendor tends to describe what its product does well and quietly leave out what it does not. Once that document becomes your baseline, other vendors are compared on the first vendor's terms.
As an independent consultant, I write the BRD from your business outward. I have no product to fit it to, so the requirements describe your processes, your controls and your growth plans. You can share the document with any vendor, and each one is measured against the same neutral standard.
I also stay with the document after it is signed. I can use it to evaluate proposals, review the implementer's solution design, and check that UAT covers what the business agreed. If you need help before the BRD, my ERP business analysis service covers the discovery work, and you can contact me to scope a BRD for your project.
Tell me about your business and current systems. I’ll suggest the most sensible first step.
Book a Consultation
Not sure which ERP you need?
Share your business requirements with me and I will help you understand the right process, architecture and platform before implementation.
A business requirement document, or BRD, describes what an ERP must deliver for the business: objectives, scope, processes, prioritized requirements, data, integrations, reporting and acceptance criteria. It is the agreed reference that vendors quote against, implementers design from and the business tests against.
A BRD describes what the business needs and why, independent of any product. A functional specification or solution design describes how a specific platform will be configured or built to meet those needs. The BRD comes first; the functional design is produced once a platform has been chosen.
Each process owner signs off their own sections, the IT or systems lead confirms technical and data requirements, the finance controller confirms accounting and reporting needs, and the executive sponsor approves the document as the project baseline. Sign-off should follow a real review, not a deadline.
Yes. I review it for missing sections, unclear or untestable requirements, inflated priorities and wording that favors one product. You receive a corrected, neutral version along with a short note explaining the main changes, so stakeholders understand what was adjusted and why.
Long enough to be complete and short enough to be read. The size depends on the number of entities, processes and integrations in scope. I focus on clarity and prioritization rather than page count, and I use appendices for detailed requirement tables so the main document stays readable.
Every business is different. Share where you are today and what you want to fix, and I’ll tell you honestly whether and how I can help.
Book a Consultation
Book a consultation to talk through your processes, systems and goals. I’ll reply with practical next steps - no obligation.